May 2010 Renewal of a 60-bar steam system of a power plant
Each component will be prefabricated at the workshop in Soltau of Röhrs AG and will be assembled on site at the power plant.
Photo 1:
Storage of mouldings and fittings for prefabrication: material 13 CrMo 4-5
Photo 2: small fittings DN25 made out of material 13 CrMo 4-5
Photo 3: fittings DN 100 - DN 200; material 13 CrMo 4-5
photo 4:
prefabricated components DN 25 (small fittings); material 13 CrMo 4-5