Piping installations & Power plant services

References 2007 - 2010 (Exctract)

2010

  • MiRO Mineralölraffinerie Oberrhein GmbH & Co. KG
    Power Plant Karlsruhe:
    Delivery and assembly as well as engineering of a 60bar-steam system including water-steam cycle; Exchange of Eco Pack
  • BORSIG Boiler Systems
    EDEA Geleen:
    Erection of 2 pcs. boiler systems with natural gas firing and a steam generation of 150t/h, including delivery of water-steam cycle. Produced steam is used as process steam with a parameter of 79 bar and 500°C.
  • WULFF Deutschland GmbH
    University hospital Freiburg:
    Erection of a waste heat boiler with auxiliary firing after gas turbine. Waste heat boiler is made for parameters of 75 bar and a temperature of 495°C at a steam generation of 55 t/h

    Erection of a vessel in Portugal
  • Stork Thermeq B. V. Hengelo
    NAM Schoonebeek
    : Erection of 2 pcs. vessels. Steam is used for low-pressure steam injection as well as for production of electrical energy.
  • Siemens Power Generation Anlagentechnik GmbH Österreich
    Delivery and assembly of 4 pcs injection cooler (X 10 CrMoVNb 9.1)

2009

  • WULFF Deutschland GmbH
    RDF-Power Plant Gersthofen:
    Erection of a RDF-fired boiler system with parameters of approx. 4 Mwel and up to 30 MWth supply of process steam and delivery of water-steam cycle.

    Murco Petroleum Ltd.  Milford Haven Refinery: Erection of 3 pcs waste heat steam generators including plants for a thermal power plant combined heat and power plant.

    Siegerland: Assembly superheater

    Belgomilk Langemark:  Erection of a vessel

  • Stork Thermeq B. V. Hengelo
    Exchange of 19 pcs outlet collectors in the superheater (10 CrMo 9.10);

    Exchange of fitting DN 250 (X 10 CrMoVNb 9.1)
  • Kali und Salz AG
    Power Plant Heringen:
    Delivery and assembly of the low-pressure steam system

2008

  • Wulff Deutschland GmbH
    MVV Korbach
    : Erection of a RDF-fired boiler system with parameters of approx.  4 Mwel and up to 30 MWth process steam and delivery of water-steam cycle.
  • K + S KALI GmbH
    Renewal of feed water and high-pressure steam pipings, incl. production of connection to the new waste-to-energy power plant.
  • Balcke Dürr Zeitz
    Rev A, power plant Goldenberg:
    Piping turbines: modification of a high-pressure live steam line and replacement of a high-pressure/middle pressure overflow line 
  • Stork Thermeq B. V.
    Works Nijmegen, NL:
    Assembly of vaporizer Line 2

    Wijster: Exchange of superheater pack 2 and 1B

  • Kali und Salz GmbH - Works Werra
    Works Wintershall: Building of a steam and feedwater pipe
    material 15 Mo3, 10 CrMo 9.1 and X 10 CrMoVNb 9.1
     
  • INTEGRAL Engineering und Umwelttechnik GmbH Vienna
    Works Höchst/Frankfurt: Prefabrication and assembly of high-pressure steam pipe (13 CrMo44, dimension tube 457,0 mm x 36,0 mm)

  • Cargill GmbH
    Salzgitter: Prefabrication and assembly of steam and condensation pipe at the malt tower

2007

  • Wulff Deutschland GmbH
    Mitsubishi Paper Flensburg:
    Insertion and erection of a flue-tue waste heat boiler with an output of 25 t/h after gas turbine, incl. water steam cycle.
  • Stork Thermeq B.V.
    Power Plant Maasbracht:
    Program for exchange of fittings and moulded parts;
    Power Plant Nijmegen:
    Exchango von high-pressure collector nozzles;
    (X 10 CrMoVNb 9.1)


  • Volkswagen AG
    Production of pressure vessels;
    Modification high-pressure steam stations (X 10 CrMoVNb 9.1; 10 CrMo 9.1)

  • Siemens AG
    Power Plant Wolfsburg: Assembling and dissassembling at pipings towards turbine revision (15 Mo3 und X 10 CrMoVNb 9.1)
  • Balcke Dürr Austria
    Biomass power plant Simmering and Timelkam
    : Production of steam boiler collectors in shop fabrication; (X 10 CrMoVNb 9.1);

    Biomass power plant Simmering: Welding on site of steam boiler collecto;
    (X 10 CrMoVNb 9.1)


  • Kraftanlagen München
    OMV Burghausen: Erection of high-pressure steam pipe; (X 10 CrMoVNb 9.1)