References 2007 - 2010 (Exctract)
2010
- MiRO Mineralölraffinerie Oberrhein GmbH & Co. KG
Power Plant Karlsruhe: Delivery and assembly as well as engineering of a 60bar-steam system including water-steam cycle; Exchange of Eco Pack
- BORSIG Boiler Systems
EDEA Geleen: Erection of 2 pcs. boiler systems with natural gas firing and a steam generation of 150t/h, including delivery of water-steam cycle. Produced steam is used as process steam with a parameter of 79 bar and 500°C.
- WULFF Deutschland GmbH
University hospital Freiburg: Erection of a waste heat boiler with auxiliary firing after gas turbine. Waste heat boiler is made for parameters of 75 bar and a temperature of 495°C at a steam generation of 55 t/h
Erection of a vessel in Portugal
- Stork Thermeq B. V. Hengelo
NAM Schoonebeek: Erection of 2 pcs. vessels. Steam is used for low-pressure steam injection as well as for production of electrical energy.
- Siemens Power Generation Anlagentechnik GmbH Österreich
Delivery and assembly of 4 pcs injection cooler (X 10 CrMoVNb 9.1)
2009
- WULFF Deutschland GmbH
RDF-Power Plant Gersthofen: Erection of a RDF-fired boiler system with parameters of approx. 4 Mwel and up to 30 MWth supply of process steam and delivery of water-steam cycle.Murco Petroleum Ltd. Milford Haven Refinery: Erection of 3 pcs waste heat steam generators including plants for a thermal power plant combined heat and power plant.
Siegerland: Assembly superheater
Belgomilk Langemark: Erection of a vessel
- Stork Thermeq B. V. Hengelo
Exchange of 19 pcs outlet collectors in the superheater (10 CrMo 9.10);
Exchange of fitting DN 250 (X 10 CrMoVNb 9.1)
- Kali und Salz AG
Power Plant Heringen: Delivery and assembly of the low-pressure steam system
2008
- Wulff Deutschland GmbH
MVV Korbach: Erection of a RDF-fired boiler system with parameters of approx. 4 Mwel and up to 30 MWth process steam and delivery of water-steam cycle.
- K + S KALI GmbH
Renewal of feed water and high-pressure steam pipings, incl. production of connection to the new waste-to-energy power plant.
- Balcke Dürr Zeitz
Rev A, power plant Goldenberg: Piping turbines: modification of a high-pressure live steam line and replacement of a high-pressure/middle pressure overflow line
- Stork Thermeq B. V.
Works Nijmegen, NL: Assembly of vaporizer Line 2Wijster: Exchange of superheater pack 2 and 1B
- Kali und Salz GmbH - Works Werra
Works Wintershall: Building of a steam and feedwater pipe
material 15 Mo3, 10 CrMo 9.1 and X 10 CrMoVNb 9.1
- INTEGRAL Engineering und Umwelttechnik GmbH Vienna
Works Höchst/Frankfurt: Prefabrication and assembly of high-pressure steam pipe (13 CrMo44, dimension tube 457,0 mm x 36,0 mm) - Cargill GmbH
Salzgitter: Prefabrication and assembly of steam and condensation pipe at the malt tower
2007
- Wulff Deutschland GmbH
Mitsubishi Paper Flensburg: Insertion and erection of a flue-tue waste heat boiler with an output of 25 t/h after gas turbine, incl. water steam cycle.
- Stork Thermeq B.V.
Power Plant Maasbracht: Program for exchange of fittings and moulded parts;
Power Plant Nijmegen: Exchango von high-pressure collector nozzles;
(X 10 CrMoVNb 9.1) - Volkswagen AG
Production of pressure vessels;
Modification high-pressure steam stations (X 10 CrMoVNb 9.1; 10 CrMo 9.1) - Siemens AG
Power Plant Wolfsburg: Assembling and dissassembling at pipings towards turbine revision (15 Mo3 und X 10 CrMoVNb 9.1)
- Balcke Dürr Austria
Biomass power plant Simmering and Timelkam: Production of steam boiler collectors in shop fabrication; (X 10 CrMoVNb 9.1);Biomass power plant Simmering: Welding on site of steam boiler collecto;
(X 10 CrMoVNb 9.1) - Kraftanlagen München
OMV Burghausen: Erection of high-pressure steam pipe; (X 10 CrMoVNb 9.1)